750HP workover rig truck-mounted ZJ30 drilling rig | FRT Machinery
750HP workover rig truck-mounted ZJ30 drilling rig | FRT Machinery
750HP workover rig truck-mounted ZJ30 drilling rig | FRT Machinery
750HP workover rig truck-mounted ZJ30 drilling rig | FRT Machinery
750HP workover rig truck-mounted ZJ30 drilling rig | FRT Machinery
  • 750HP workover rig truck-mounted ZJ30 drilling rig | FRT Machinery
  • 750HP workover rig truck-mounted ZJ30 drilling rig | FRT Machinery
  • 750HP workover rig truck-mounted ZJ30 drilling rig | FRT Machinery
  • 750HP workover rig truck-mounted ZJ30 drilling rig | FRT Machinery
  • 750HP workover rig truck-mounted ZJ30 drilling rig | FRT Machinery

750HP workover rig truck-mounted ZJ30 drilling rig

ZJ30/1800CZ truck mounted drill machine is a type of light truck mounted drilling rig self-developed by our company. It adopts double engine parallel power system. Gear parallel can achieve the power shift between vehicle driving and drilling operation, between single engine working and double engine working. Through years of technology innovation and continuous improvement, it has become more mature and reliable.

Description

ZJ30/1800CZ truck mounted drill machine is a type of light truck mounted drilling rig self-developed by our company. It adopts double engine parallel power system. Gear parallel can achieve the power shift between vehicle driving and drilling operation, between single engine working and double engine working. Through years of technology innovation and continuous improvement, it has become more mature and reliable.

27.jpg

Application                                                                                                                                                                                                                                                                
This hydraulic drilling rig is suitable for drilling operation of middle and shallow wells which is less than 3000m, heavy repair operations of oil and gas wells and water well drilling operations. Adopting a number of patented technologies, the rig now is with the features of reasonable layout, reliable operation performance and low transportation cost, easy for on-site installation and maintenance.

Product Paramenters

7.jpg

Features of Truck Mounted Drilling Rig                                                                                                                                                                                                                  
1. The Truck-mounted drilling rig is driven by diesel engine with reasonable power matching, high transmission efficiency, high reliability, compact structure, high degree of assembly and small footprint.
2. Self-made heavy-duty chassis, equipped with hydraulic power steering system, with good mobility, off-road and transverse stability.
4. The mast set with two sections at the front opening, tilting forward or standing upright, lifting and stretching of the hydraulic cylinder, and is equipped with wind guy lline and anti-overturn guyline.
3. The main brake adopts band brake or hydraulic disc brake, and the auxiliary brake adopts pneumatic push-disc brake, pneumatic clamp disc brake or water brake.
6. The drilling floor adopts the telescopic or spiral lifting structure, the floating platforms on both sides can be turned over, and the sledding can be hoisted and transported.Table height, size, layout can be customized.
5. The rotary table drive system can realize the positive rotation, reverse rotation, suspension and disconnection of the rotary table, and is equipped with the reverse torque release device to ensure the safe release of the rotary table drilling string torque.
7. Perfect peripheral equipment of solid control, well control, high-pressure manifold, mud pump unit, oil and water tank, etc.It can be matched arbitrarily or customized as required.
17.jpg
Item
Technical specification
1
Model
ZJ30/1800CZ
2
Drilling depth (4 1/2" Drill Pipe) (m)
3000
3
Overhaul depth (3 1/2" Drill Pipe)(m)
6500
4
Max. hook load (kn)
1800
5
Hook speed (m/s)
0.2 to 1.4
6
Mast (m)
38/39
7
Mast type
A-mast
8
Engine power(kW)
2 x 403
9
Hydraulic transmission box
2xM5620AR
10
Transmission type of mechanical drill equipment
Hydraulic + Mechanical
11
Traveling system
6 x 5
12
Main rope diameter (mm)
φ32
13
Hook Block model
YG180
14
Swivel model
SL225
15
Rotary table model
ZP275
16
Chassis model
XDP70/14x8
17
Approach / departure angle
26"/18"
18
Min. ground clearance(mm)
311
19
Max. Gradeability
26%
20
Min. turning diameter (m)
41
21
Overall dimension (m)
22.3 x 3.2 x 4.5
22
Main unit mass (kg)
82000
10.jpg
Company Introduction
Our products cover more than 10 series with over 180 kinds, including truck-mounted drilling rigs, skid-mounted drilling rigs, trailer-mounted drilling rigs, work over rigs, etc. Our 4000m truck-mounted drilling rig and 4000m trailer-mounted drilling rig is the largest self-propelled drilling equipment in the worldwide, with high-competitive in the international market, providing the advanced drilling equipment for factory drilling.

Our company is committed to study the unconventional oil and gas equipment, and oil and gas exploration equipment under special environment such as offshore, desert, shallow, rainforest and cold weather (polar region). At the same time, mechanization and intellectualization of equipment are improved and developed continuously. We developed the cold weather drilling rigs that can adapts to the 45℃ to -60℃ temperature, the series of drilling rig are exported to high-end market such as Russia and Canada. The truck-modular rigs and free-standing drilling rigs can meet the different requirements from the customer.

FRT regards continuous learning ability as one of the company’s core competitiveness and provides regular training to employees to enhance their comprehensive abilities and skills.

We are committed to focusing on the challenges and pressures of customers' attention, providing competitive solutions and continuously creating the maximum value for customers. Safety and environmental and social responsibility are at the core of all our business activities.

1.jpg

FAQ                                                                                                                                                                                                                                                                             
1. Can you produce the drilling rig as per drawings or technical requirements?
Yes, we can produce the drilling rig as per your drawings and requirements.

2. What's the payment term?
30% advance payment after signing the contract, 30% production progress payment after 1-2 month's production, 30% balance payment before delivery, remaining 10% shall be paid after installation.

3. Can we visit your company before placing order?
Welcome to our company any time you like.

Related Product

Chat with us